Hotel das Antas

Construction and Rehabilitation

Details

  • PORTO ANTAS HOTEL
  • Ana Franco
  • Lógica2

Request a quote

Fill in all the useful information so we can better understand your needs.

    About the Project

    Remodelling and enlargement from 30 to 41 rooms, of the Antas hotel, constituted by five floors and located near the dragão stadium. All the intervention took place with the hotel in operation, and Logica 2 was responsible for the following works: demolition, waterproofing and thermal insulation, exterior flooring, exterior walls, exterior painting, masonry, ceiling coating, interior wall cladding, interior floor cladding, painting, sanitary ware, taps and fittings, sanitation, rainwater, water/fire and stability. 

    Industrial engineering is concerned with the development, improvement, and implementation of integrated systems of people, money, knowledge, information, equipment, energy, materials, analysis and synthesis, as well as the mathematical, physical and social sciences together with the principles and methods of engineering design to specify, predict, and evaluate the results to be obtained from such systems or processes.

    Our Client’s Challenge

    In October 2020, the TransGas Prud’homme Gas Storage Caverns in Saskatchewan were left ablaze after a significant explosion which occurred at the principal wellhead. Gas production from this facility is crucial during the winter when natural gas demands are the highest. It was therefore critical that the facility was repaired in time before the cold set in.

    Our Approach

    In order to meet the required schedule, TransGas delegated procurement and construction management services to WSP. WSP’s procurement procedures allowed for the selection of contractors and material suppliers in an efficient manner while still ensuring traceability for insurance auditors.
    • Natusvoluptatem accusantium doloremque
    • Sed perspiciatis unde omnis
    • Natusvoluptatem accusantium
    • Beatae vitae dicta sunt perspiciatis
    • Unde omnis natusvoluptatem explicabo.
    • Eaque ipsa quaed veritatis et quasi

    Outcome

    The $4 million project was successfully completed in two separate phases with both phases coming in on schedule and the overall costs coming in under budget. Emergency repairs to the facility were completed on December 11th, 2014 which allowed for the facility to operate through the critical winter months. Permanent electrical repairs along with less critical site deficiencies were completed in April and May of 2016 when a longer facility shut-down could be tolerated. In order to meet the required schedule, TransGas delegated procurement and construction management services to WSP. WSP’s procurement procedures allowed for the selection of contractors and material suppliers in an efficient manner while still ensuring traceability for insurance auditors.