    About the Project

    A remodelação de uma das lojas mais antigas da Baixa Pombalina, num cunhal da Rua Augusta, Chiado, um espaço comercial de duas frentes e em contiguidade com a rua pedonal, acompanhada pelo IPAR (Instituto Português do Património Arquitetónico).

    Todos os trabalhos foram executados com a mínima interferência nas características estruturais e decorativas da loja. A renovação consistiu sobretudo na recuperação e beneficiação dos materiais existentes na loja, tais como o piso cerâmico, as guarnições em madeira dos nichos, guarda-corpos da escada, caixilharia exterior e mobiliário embutido.

    Industrial engineering is concerned with the development, improvement, and implementation of integrated systems of people, money, knowledge, information, equipment, energy, materials, analysis and synthesis, as well as the mathematical, physical and social sciences together with the principles and methods of engineering design to specify, predict, and evaluate the results to be obtained from such systems or processes.

    Our Client’s Challenge

    In October 2020, the TransGas Prud’homme Gas Storage Caverns in Saskatchewan were left ablaze after a significant explosion which occurred at the principal wellhead. Gas production from this facility is crucial during the winter when natural gas demands are the highest. It was therefore critical that the facility was repaired in time before the cold set in.

    Our Approach

    In order to meet the required schedule, TransGas delegated procurement and construction management services to WSP. WSP’s procurement procedures allowed for the selection of contractors and material suppliers in an efficient manner while still ensuring traceability for insurance auditors.
    • Natusvoluptatem accusantium doloremque
    • Sed perspiciatis unde omnis
    • Natusvoluptatem accusantium
    • Beatae vitae dicta sunt perspiciatis
    • Unde omnis natusvoluptatem explicabo.
    • Eaque ipsa quaed veritatis et quasi

    Outcome

    The $4 million project was successfully completed in two separate phases with both phases coming in on schedule and the overall costs coming in under budget. Emergency repairs to the facility were completed on December 11th, 2014 which allowed for the facility to operate through the critical winter months. Permanent electrical repairs along with less critical site deficiencies were completed in April and May of 2016 when a longer facility shut-down could be tolerated. In order to meet the required schedule, TransGas delegated procurement and construction management services to WSP. WSP’s procurement procedures allowed for the selection of contractors and material suppliers in an efficient manner while still ensuring traceability for insurance auditors.